The construction lasted 1 month to be concluded.
The drawings following show the steps of the project:
PRELIMINARY PLANTS ( 2 PLANTS - 1- "DUE TO CONSTRUCT, DUE TO DEMOLISH AND EXISTENT" /2- " RELATION OF SYMBOLS OF ELECTRIC AND HYDRAULIC POINTS DUE TO INSTALL, BESIDES MATERIALS OF COATING - THE FLOOR, THE WALL AND THE CEILING")
The drawings following show the steps of the project:
PRELIMINARY PLANTS ( 2 PLANTS - 1- "DUE TO CONSTRUCT, DUE TO DEMOLISH AND EXISTENT" /2- " RELATION OF SYMBOLS OF ELECTRIC AND HYDRAULIC POINTS DUE TO INSTALL, BESIDES MATERIALS OF COATING - THE FLOOR, THE WALL AND THE CEILING")
DETAILED DRAWINGS ( TOTAL 4 PLANTS)
PLANTS OF SANITARY SEWER (TOTAL - 6 PLANTS)
PLANTS WITH MORE DETAILS (TOTAL - 6 PLANTS)